This site required a Flood Risk Assessment for an Industrial Building Extension in Flood Zone 3.

Environment Agency data was interpreted to give a flood level that enabled flood resilient construction techniques to be recommended.

The flood evacuation plan demonstrated that in the times of flooding the building could be evacuated safely.

Using 3D modelling software we were able to demonstrate that flood water flow paths were maintained and the increase in flood depths was acceptable